خانه محصولاتدیواره غشاء دیگ

SA 210 A1 Material and Welding Installation for Durable Performance of Boiler Tubular Membrane Wall

گواهی
چین Jiangsu Sat-Cham Energy Technology Co., Ltd. گواهینامه ها
چین Jiangsu Sat-Cham Energy Technology Co., Ltd. گواهینامه ها
چت IM آنلاین در حال حاضر

SA 210 A1 Material and Welding Installation for Durable Performance of Boiler Tubular Membrane Wall

SA 210 A1 Material and Welding Installation for Durable Performance of Boiler Tubular Membrane Wall

شرح
Temperature Range: Up To 600°C Welding Way: Submerged Arc Welding
Fuel: Coal/Gas/Oil-fired, Water Heat Welding Technique: Submerged Arc Welding
Manufacturer: Specialized Boiler Membrane Wall Manufacturer Model: Boiler Part
Dimension Of Tube: 38.1*3.2 Tube Material: SA 210 A1
برجسته کردن:

SA 210 A1 boiler membrane wall

,

welding installation for boiler tubes

,

durable tubular membrane wall

Product Description: With dimensions of 38.1*3.2, the Boiler Membrane Wall is crafted to precise specifications to fit various boiler systems seamlessly. The use of Submerged Arc Welding technique ensures strong and durable welds, providing structural integrity to the entire system. The Boiler Membrane Wall serves as a crucial component in the boiler tubular membrane wall system, contributing to the containment and efficient transfer of heat within the furnace. Its flexibilit

اطلاعات تماس
Jiangsu Sat-Cham Energy Technology Co., Ltd.

تماس با شخص: Mr. Chen

تلفن: +8615150235238

ارسال درخواست خود را به طور مستقیم به ما (0 / 3000)